Haier HFU-09H03/R2(DB) Service Manual page 60

Domestic
Hide thumbs Also See for HFU-09H03/R2(DB):
Table of Contents

Advertisement

Installation Manual of Room Air Conditioner
Others
1. Power supply
Air conditioner must use an exclusive line(over 20A) and there is not power plug with this type,
the type of power supply wire is HF05VV-3G2.5mm
When installation air conditioner in a wet place, try to use a circuit breaker against current
leakage.
For installation in other places, use circuit breaker as for as possible.
2. Piping cutting and flaring
Be sure to carry out deburring after cutting with a pipe cutter.
Insert flaring tool to make a flare
A
Correct
Installation inspection and test run:
Please operate unit according to this Manual
Items to be checked during test run. Please made a "
Are there any gas leakage?
How is insulation at piping connection carried out?
Are electric wires of indoor and outdoor unit firmly inserted into terminal block?
Is electric wiring of indoor and outdoor securely fixed?
Is drainage securely carried out?
Is earth line(grounding) securely connected?
Is power supply voltage abided by the code?
Is there any noise?
Is control display normal?
Is cooling operation normal?
Is room temp. regulator normal?
Domestic Air Conditioner
Flare tooling die
Lean Damage of flare Crack
Model:
2
.
Pipe diameter
Liquid side
6.35mm(1/4")
9.52mm(3/8")
Gas side
12.7mm(1/2")
Gas side
Incorrect
Partial
" in "
"
58
Size A (mm)
0.8~1.5
1.0~1.8
1.2~2.0
Too outside

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfu-12h03/r2(db)

Table of Contents