Installing Transceivers And Module Connectors; Attaching Network Interface Cables; Attaching Optical Network Interface Cables - Cisco Catalyst 6800 Installation Manual

Ethernet module
Table of Contents

Advertisement

Installing and Removing Modules, Transceivers, and Attaching Cables
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous
voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt
other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless
all cards, faceplates, front covers, and rear covers are in place. Statement 1029

Installing Transceivers and Module Connectors

Some Ethernet modules require that pluggable transceivers be installed in the module port sockets. These
transceivers are normally shipped separately from the module and must be installed after the module is installed
in the chassis slot.
For detailed instructions about installing the various kinds of pluggable transceivers and module connectors,
see the following:
Transceiver or Module Connector Type
SFP and SFP+
Related Topics
Pluggable Transceivers, on page 47
Module Connectors, on page 51

Attaching Network Interface Cables

Attaching Optical Network Interface Cables

Before You Begin
Follow the guidelines prescribed for maintaining fiber-optic connectors
Do not remove the plugs from the transceiver optical bores or the fiber-optic cable until you are ready to
Caution
connect the cable. The plugs protect the transceiver optical bores and cable from contamination.
Step 1
Remove the dust plugs from the network interface cable optical connectors. Save the dust plugs for future use.
Step 2
Immediately inspect and clean the optical connector's fiber-optic end-faces.
Always inspect and clean the SC or the LC connector end-faces just before making any connections.
Step 3
Remove the dust plugs from the transceiver optical bores.
If you are using the LX/LH GBIC with MMF, you need to install a patch cord between the GBIC and the MMF cable.
Installing Transceivers and Module Connectors
Installation Procedure Document and Link
Cisco SFP and SFP+ Transceiver Module Installation Notes
Catalyst 6800 Ethernet Module Installation Guide
Cleaning the Fiber-Optic Connectors
31