3-4.
TAPE MECHANISM DECK
Note: This illustration is seeing top panel block from inside.
two screws
(BVTP2.6 × 8)
RB tape mechanism deck
Open the cassette box.
3-5.
FRONT PANEL BLOCK
connector (CN470)
screw
(BVTP3 × 10)
RB harness
screw
(BVTP3 × 10)
panel loading
two screws
(BVTP3 × 10)
two screws
bracket (deck)
(BVTP2.6 × 8)
RE two harnesses
RT screw
(BVTP3 × 10)
connector (CN488)
connector (CN903)
flexible flat cable (CN403)
screw (BVTP3 × 10)
RG front panel block
HCD-GT111/GT222/GT444/GT555
TC board
two bracket (PWB)
TC shield board
(AEP, Russian, UK )
connector (CN501)
two screws
(BVTP3 × 12: AEP, Russian, UK)
(BVTP3 × 8: except AEP, Russian, UK)
Cut the two clamps.
top panel block
hole
Pull the
tray by hand.
gear
Turn a gear by
a driver till a lever
falls down to the
position of the figure.
lever
11