2. Warnings and Cautions
2.1.
Installation Consideration
When planning installation of the HORIZON3D S, ensure that the auditorium throw ratio
is greater than 1.5:1.
When planning installation of the HORIZON3D, ensure that the auditorium throw ratio is
greater than 0.8:1.
2.2.
Heat Damage
To avoid burning the polarizer film of the liquid crystal panel ensure a panel surface
temperature of <80˚F is maintained.
2.3.
General Electrical Safety
Disconnect the power cord before servicing or opening the control box for any reason.
2.4.
General Handling
Avoid touching any optical components with bare hands. Handle the optical head
assembly by the handles only.
Installation & Operation Manual | HORIZON3D & HORIZON3D S
© MASTERIMAGE 3D, Inc.
8
Need help?
Do you have a question about the HORIZON3D and is the answer not in the manual?
Questions and answers