OPERATING PROCEDURE
3. Heat Exchanger, Compressor
(1)
Remove the rear panel (2 screws in front, 1 screw
on the side, 3 screws in the rear).
Remove the valve bed, and open the rear panel to
the rear t o remove.
NOTE
:
All panels are clasped and must be removed by shifting
up and down.
(2) Remove right side panel
(4
screws).
(3) Remove rear guard (3 screws).
(4)
Remove separator support plate (4 screws).
(5)
Remove motor support (2 screws).
(6) Remove valve bed ( 5 screws). The valve bed is
anchored by clicks on the right and left sides. Lift
to remove.
(7) Remove the electrical parts box.
Remove the respective connectors from high-
pressure switch, Low-pressure switch, crank case
heater, shell thermo, and fan motor lead.
(8) Remove separator (2 screws).
(9) Remove heat exchanger (2 screws).
Disconnect the welded section of pipe.
(10) Remove compressor (3 set nuts).
Remove the weldment of the compressor suction
pipe and discharge pipe.
PHOTOS
Photo 4
. " '
Screws
" - ,
Screws
Photo 5
Heat exchanger
Accumulator-
Photo 6
Charge pluy
Ball valve-
Compressor-