Mitsubishi Electric PL18FK2 Service And Parts Manual page 109

Ductless split type air conditioners series pl ceiling cassettes series pll ceiling cassettes series pc ceiling suspended series pcl ceiling suspended series pk wall mounted series pkl wall mounted
Table of Contents

Advertisement

14-5 Outdoor unit (PU24EK)
OPERATING PROCEDURE
1
.
Electrical parts
(1) Remove top panel (3 screws in front, 2 screws in
rear)
(2) Remove panel cover (1 screw).
The panel is clasped to the side panel.
Remove by pulling towards you.
(3) Remove service panel (1 screw).
The panel is clasped on the right and left sides.
After removing the screw, pull the panel down and
remove it by pulling towards you.
2. Blower motor
(1
)
Remove front panel (3 screws).
Open the panel to a 45 degree angle and lift to
remove. The panel is clasped at three points on the
left side.
(2)
Remove propeller fan (1 set nut).
(3) Remove fan motor (3 screws).
Remove lead connectors.
PNOTOS
Screws
Photo 1
Photo
2
Compressor protector
\
Run capacitor
Screws
/52C
relay
>rrninal
block
Motor support
Separator support place
Photo 3
!
Propeller
I
High- press1
switch
'Valve
bed
ure
/
Propeller
Crank case heater
1 0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents