Gas Pressure Adjustment; Replacement Of Parts - IDEAL Mexico RS 3/100 Installation And Servicing Manual

Floor standing, gas fired, balanced flue, room sealed boiler
Table of Contents

Advertisement

34 GAS PRESSURE ADJUSTMENT

1. Pilot Pressure
Pilot adjustment is factory set to maximum and no
adjustment is possible.
2. Main Burner Pressure
After servicing, reference should be made to Table 1,

REPLACEMENT OF PARTS

35 GENERAL
When replacing any component:
1. Isolate the electricity supply.
2. Turn off the gas supply at the boiler.
36 SIGHTGLASS REPLACEMENT
1. Unfasten the 2 M5 hexagon nuts and washers.
Remove the assembly from the front plate.
2. Fit the new sightglass and re-assemble, as shown.
3. Retighten the 2 M5 hexagon nuts to ensure an
airtight seal. Do NOT overtighten.
37 PIEZO UNIT REPLACEMENT
1. Disconnect the ignition lead from the
piezo unit body.
2. Remove the retaining nut and withdraw
the unit, as shown.
3. Fit the new unit and reassemble in
reverse order.
Mexico Super RS 3/100 & 3/125 -
SERVICING
which quotes details of the rated output with the related
burner pressure and heat input. Any required
adjustments should be made using the pressure
adjustment screw. Refer to Frame 24, 'Initial Lighting.
Refit the lower front panel
3. Remove the lower front panel grille assembly.
For replacement of pumps or programmer units refer to
the separate Pump Kit or Programmer Kit Instructions.
Installation
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mexico rs 3/125

Table of Contents