3 BOILER ASSEMBLY - Exploded View
Mexico Super RS with casing removed - RS 3/100 shown.
Mexico Super RS 3/100 & 3/125 -
INSTALLATION
LEGEND
1. Heat exchanger assy.
2. Front section.
3. Middle section.
4. Section alignment rings & 'O' rings
6. Thermostat pocket.
7. Distributor tube.
8. Combustion chamber.
12. Collector hood.
Installation
13. Cleanout cover.
47. Baseplate.
14. Front plate.
52. Heat shield.
22. Gas control valve.
24. Piezo unit.
28. Gas cock.
34. Phial clip.
35. Split pin.
46. Air/flue duct assy.
9