Cleaning The Siphon; Gas Pressure Adjustment; Replacement Of Parts - IDEAL classic HE15P Installation And Servicing Manual

Classic he p series
Hide thumbs Also See for classic HE15P:
Table of Contents

Advertisement

58 CLEANING THE SIPHON

1. Pull the heat shield forward to remove from clips.
2. Unscrew the siphon union connection.
3. Remove the rubber sump connection pipe and the
blockage sensing pipe.
4. Remove the two siphon retaining screws and remove
siphon.
5. Thoroughly clean the siphon.
6. Recharge the siphon with water.
7. Re-assemble in reverse order. Ensuring the rubber
sump connection pipe and blockage sensing pipe are
correctly replaced.
59 REASSEMBLY
Reassemble the boiler in the following order.
1. Refit the flue baffles.
2. Inspect the collector hood rope gasket and replace, if
necessary, ensuring that the self adhesive rope is fitted
centrally on to the lip of the collector hood / fan assembly.
The boiler efficiency will be adversely affected if incorrectly
fitted. Refit the collector hood and retain with the 2 front
and side tie rods. Tighten the nuts and screw. Ensure that
the sealing gasket is compressed.
3. Refit the fan, fan electrical connections, the thermostat
electrical connections, the red pressure sensing pipe, the
blue CO/CO
sensing pipe and the two fan fixing screws.
2

60 GAS PRESSURE ADJUSTMENT

PILOT
The pilot is factory set to maximum and no further
adjustment is possible. If, after removing and checking the
injector (as detailed in Frame 67) and ensuring that there
is an inlet pressure of 37 mbar available, the pilot does not
light then contact Ideal Stelrad Group.
Relight in accordance with 'Initial Lighting', Frame 48.
61 GENERAL
When replacing any component:
1. Isolate the electricity supply.
2. Turn OFF the gas supply.
3. Remove the boiler front panel. Refer to Frame 53.
IMPORTANT. When work is complete the casing must be
correctly refitted, ensuring that a good seal is made.
classic HE P -
Installation & Servicing
SERVICING
1
3
4. Refit the air box assembly and burner. Ensure that the burner
front fixing is refitted.
5. Refit the combustion chamber, (replacing the rope seal if
necessary) ensuring the two rubber sealing grommets are
replaced.
6. Reconnect the gas supply and the electrical wiring. Refer to
Frames 36 & 41.
7. Check the sightglass in the boiler casing. Clean or renew as
necessary. Refer to Frame 62.
8. Check for gas soundness. Check the gas service cock and
pressure test point.
9. Refit the boiler casing (refer to Frame 49). Note that it is not
necessary to disturb the controls casing pod.
10. Close the controls pod door.
MAIN BURNER
After any servicing, reference should be made to Table 2
which quotes details of the rated output with the related
burner setting pressure and the heat input.
Refer to 'initial Lighting', Frame 48.

REPLACEMENT OF PARTS

Note. In order to assist fault finding, the control box printed
circuit board is fitted with 2 indicator lights which represent the
following boiler conditions:
Neon I3.
Neon SG1. Flashes to indicate ignition operation (stops after
The boiler MUST NOT be operated if the casing is not fitted.
4
Mains electricity ON.
detection).
2
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Classic he18pHe9He12He15He18

Table of Contents