Commissioning The Control Device And The Burner; Raising The Flue Gas Temperature - Buderus Logano G215 WS Installation And Maintenance Instructions Manual

Oil and gas-fired special
Hide thumbs Also See for Logano G215 WS:
Table of Contents

Advertisement

9.3

Commissioning the control device and the burner

To continue the commissioning procedure, follow the
steps for commissioning the burner. Refer to the
burner documentation.
Start up the heating system using the control device
ON/OFF switch. The burner starts if a heat demand is
present or if you switch the control device to manual
(
control device service instructions).
Set the desired temperature on the boiler water
thermostat.
Select "Manual" mode
Switch the ON/OFF switch on (position "I").
9.4

Raising the flue gas temperature

For the set flue gas temperature for the boiler, see the
Specifications (
Section 3, page 7)
You may raise the flue gas temperature using one or
more of the measures listed below if you notice during
testing that the flue gas temperature is too low for the
type of chimney used (risk of condensation):
– Remove hot gas baffle plates
– Remove the hot gas check plate
Shut down the heating system (
page 47).
RISK OF EXPLOSION
through escaping gas.
Close the main shut-off valve if gas
WARNING!
pipes need to be pulled off the gas
burner to open the burner door. Route
the remaining escaping gas outdoors.
RISK OF BURNING
through touching hot boiler parts.
Wear appropriate protective gloves or
CAUTION!
use pliers.
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
.
Section 10.1,
Commissioning the heating system
1
Fig. 65 Starting up the control device (for example
Logamatic 2000)
1 Boiler water thermostat
2 ON/OFF switch
9
I 0
2
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents