System Start-Up; Making The System Operational; Commissioning The Control Device And The Burner - Buderus SB735 Series Operating Instructions Manual

Condensing gas boiler
Hide thumbs Also See for SB735 Series:
Table of Contents

Advertisement

System start-up

4
System start-up
This chapter explains how you prepare the system for
operation and how to commission the control device and
the burner.
4.1

Making the system operational

You should check the following to prepare the system for
operation:
the system water pressure see Chapter 7.2
"Checking and correcting the water pressure",
page 13),
whether the main fuel supply shut-off valve is open,
whether the heating system emergency stop switch
has been activated or the boiler room fuse is
inserted.
Let your specialist show you where the fill valve is
located in the pipework of your system (return).
4.2
Commissioning the control device
and the burner
Start up your boiler via the control device (in this
example (Fig. 2): 2000 series Logamatic control device).
By commissioning the control device, you also
automatically commission the burner. The burner can
then be started via the control device. For further details
in this connection, see the operating instructions of the
relevant control device or burner.
Switch the boiler water thermostat (Fig. 2, item 1) to
"AUT".
Set the On/Off switch (Fig. 2, item 2) to "I" (ON).
USER NOTE
Please observe the operating
instructions of the control device.
We reserve the right to make any changes due to technical modifications.
Operating instructions condensing gas boiler Logano plus SB735 • Issue 10/2003
1
Fig. 2
2000 series Logamatic control device
Item 1: Boiler water thermostat
Item 2: On/Off switch
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
4
2
9

Advertisement

Table of Contents
loading

Table of Contents