Hammer Strength Heavy Duty Power Rack User Manual page 10

Heavy duty power rack
Table of Contents

Advertisement

3
5
STEP 3:
LOOSELY assemble the TOP CROSS BEAM (10) and UPPER LEFT and RIGHT SIDE FRAMES (11 & 12) to the
FRONT LEFT and RIGHT UPRIGHTS (1 & 7) using six 1/2 X 4-1/2" BOLTS (3), ten 1/2" INT LOCK WASHERS (5),
two BACKING DOME WASHERS (4) and six 1/2" LOCK NUTS (6).
Note: An Upper Band Peg accessory is available for the HDPR8. Assemble the UPPER BAND PEG ACCESSORY (A)
to the FRONT LEFT UPRIGHT (1) at the same time as the TOP CROSS BEAM (10). Use the same hardware
with the exception of replacing the 1/2 X 4-1/2" BOLTS (3) with the provided 1/2 X 5" BOLTS (B).
10
6
4
1
10
12
7
1
A
5
B
10
8
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

HdprHdpr8Hdpr9

Table of Contents