Section 4: Wiring; Installing The Fireplace Control Box - Montigo R420 Installation Manual

R-series indoor residential fireplace
Table of Contents

Advertisement

R320 & R420 Power Vent Indoor Gas Fireplace

Section 4: Wiring

Installing the Fireplace Control Box

Install the Fireplace Control Box in an accessible location. The
location should be where maintenance, adjustments and service
may be made easily.
required for either Horizontal
or Vertical Termination Vent
Horizontal
Power Vent
Termination
Control
115Vac 60 Hz
Box
supply from
Distribution Panel
Wall Switch
20 foot control
cable to replace
(standard)
Figure 15.
R320* / R420* Series Control Box / Power Vent Wire Routing Diagram
Page 22
Installation
Vertical
Power Vent
Termination
Power cable Installatio n
Power
Vent
XG0770 - 150105.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

R320

Table of Contents