Component Replacement Procedure

1.
Air Pump – Follow same procedure as outlined in the "Instal-
lation Instructions".
2.
Float Switch – Remove Treatment Plant's Riser or 24 inch
cover. Locate float switch cable. Untie knot. Cut float switch
cable. Slip float switch cable through rubber grommet into
the plant. Replace with exact replacement float switch. Re-
install by reversing procedure. Reconnect float switch wires
using Underground Rated Compound filled wire nuts. See
Float Switch Mounting Detail.
3.
Pressure Switch – Turn all power off to control panel. Re-
move screws securing pressure switch as well as connec-
tors and tubing. Reverse procedure to install new pressure
switch.
4.
Buzzer – Turn all power off to control panel. Remove screw
attaching buzzer to back plate as well as connectors. Re-
verse procedure to install new buzzer.
5.
Lamp-holder – Turn all power off to control panel. Remove
lock nut securing lamp-holder to door as well as connectors.
Remove lamp-holder. Install new lamp-holder with gaskets
furnished. Continue with reverse procedure.
6.
Lamp – Turn all power off to control panel. Remove red
lamp cover from front of control panel. Remove and replace
lamp which is a push in type. Replace lamp cover and cover
gasket.
7.
Fuse – Turn all power off to control panel. Pull top of fuse
holder outward. Remove and replace fuse. Push fuse back
into place.
8.
Buzzer Switch – Turn all power off to control panel. Remove
rubber boot on switch. Remove hex nut from switch on panel
front as well as connectors on switch. Reverse procedure to
install new switch.
ECOPOD-N
Fixed Film Wastewater Treatment System Unit Specifications
Treatment Capacity
Treatment Plant
(GPD)
E50-N
500
E60-N
600
E75-N
750
E100-N
1000
E150-N
1500
Suffix FF
Suffix CA
These are standard production units. Other configurations are available upon request.
Primary Tank Total
Reactor Tank
Volume (Gal)
Volume (Gal)
500
710
600
916
750
1089
1000
1427
1500
2130
Materials Of Construction
Reactor Tank
Cover
Media Container
Reactor Tank
Cover
Media Container
9

General Comments

1.
Only factory approved equipment can be used for replace-
ment on individual treatment systems.
2.
If the decision is made to pump out a system, be sure to
contact a licensed waste hauler.
3.
If a chronic problem develops and all items listed have been
checked, consult with the factory.
4.
Taking pictures of systems when troubleshooting will help
document activity in the field.
5.
Keep good records.
NOTE: If the entire cover needs to be removed on any one of the
various model treatment plants, the existing silicone or strip seal
must be removed and replaced with a new one. This will provide
a positive seal which will not allow any infiltration into or out of
the treatment plant.
Reactor Tank
Dilution
Volume (Gal)
580
736
909
1186
1771
Media Size
Air Requirements
2' x 2' x 4'
12 CFM
3' x 2' x 4'
14.4 CFM
3' x 2' x 4'
18 CFM
4' x 2' x 4'
24 CFM
6' x 2' x 4'
36 CFM
Fiberglass
Fiberglass
Fiberglass
Concrete
Concrete
Fiberglass