Delivery Inspection - Delta Environmental Products ECOPOD-N Series Safety Instructions Installation And Service Manual

Fixed film wastewater treatment system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS ONLY FOR USE BY CERTIFIED, LICENSED INSTALLERS

Delivery Inspection

The ECOPOD–N
system has been carefully manufactured,
®
inspected and tested at the factory before shipment. Upon
receiving the unit, please follow this procedure.
1.
Before unpacking, check the packaging for signs of damage.
If there is evidence of damage or abuse, notify Delta Environ-
mental Products at 1-800-219-9234
System Components-Reactor Tank
Air Pump Installation
2.
After unpacking, inspect the unit to ensure no components
are missing. Also inspect for damage to the unit. If any
discrepancies are found, notify Delta Environmental Products
at 1-800-219-9234
If the unit is free of damage, unpack completely and proceed with
the installation.
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents