S9 Antennas S9v Installation Manual page 11

43’ multiband vertical antenna
Hide thumbs Also See for S9v:
Table of Contents

Advertisement

___________________________________________________________________________
c. Now, we are ready to extend the antenna. The antenna should still be
laying flat on the ground. To extend the antenna, grab a section of the
wire near the bottom plastic cap and push the wire into the base tube.
This action should cause the top, thinnest section of the antenna (it has
shrink wrap tubing on the tip) to pop out of the top of the base tube. If this
doesn't work, pick-up the base tube and shake it slightly while pointing the
top part of the tube downward to shake out the top section.
d. Gently pull the top section straight out of the base tube (pull the section,
not the tip). Now, pull the next, lower section straight out.
e. All of the sections except the top, tip section are pre-drilled to accept the
provided stainless steel screws. Again, the top (tip) section does not
require a screw.
Twist and pull on the sections until the black mark on the upper section
aligns with the pre-drilled screw hole in the lower section. At this point,
the pre-drilled holes in both sections will be aligned.
For the lower sections that require more than one screw, align the black
mark on the upper section with the black mark above the screw hole in the
lower section. When these two black marks are aligned, all of the screw
holes will be properly aligned.
f. After you have fully extended the antenna and aligned all of the screw
holes, use a Phillips screwdriver to install the screws. DO NOT OVER-
TIGHTEN the screws as it is not necessary to make the screws extremely
tight.
________________________________________________________________________
S9v 43' Installation Guide
Grab top section
here and pull straight
out. (Cap is installed
in step g, below )
11

Advertisement

Table of Contents
loading

Related Products for S9 Antennas S9v

Table of Contents