Nx-7500 Series Sfp Installation - Motorola NX-7510 Series Installation Manual

Integrated services platform ac or dc power supply module
Table of Contents

Advertisement

14
9. Apply power to the integrated services platform.
10. Verify that the integrated services platform LCD panel is illuminated.
11. Login in to the Management Interface and verify that the replacement NMC is operational.
2.4 NX-7500 Series Integrated Services Platform SFP Installation
The NX-7500 series integrated services platform supports use of SFP transceivers
NOTE
To install a SFP transceiver:
1. Insert the SFP into the integrated services platform with the optical connector facing out and the slot
connector facing down.
2. Press the transceiver into the slot until it clicks into place.
NOTE
SPF transceivers are keyed so that they can only be installed with the correct
orientation.
Only install 10Gb SPF+ transceivers in 10Gb NMC modules and 1Gb SPF transceivers
in 1Gb NMC modules.
NX-7510/NX-7520/NX-7530 Series Integrated Services Platform

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nx-7530 seriesNx-7520 series

Table of Contents