Between - Baxi Bermuda BBU 15 HE Installation & Servicing Instructions Manual

Condensing back boiler unit
Hide thumbs Also See for Bermuda BBU 15 HE:
Table of Contents

Advertisement

Stop
Valve
Mains
Cold
Supply
Fig. 8
14
© Baxi Heating UK Ltd 2010
Supplied By www.heating spares.co Tel. 0161 620 6677
Double
Stop
Check
Valve
Valve
Temporary
CH
Hose
Return
4.0 System Details
4.7
Sealed Systems (cont)
4. FILLING POINT - A filling point connection on the
central heating return pipework must be provided to
facilitate initial filling and pressurising and also any
subsequent water loss replacement / refilling. The sealed
primary circuits may be filled or replenished by means of
a temporary connection between the primary circuit and
a supply pipe provided a 'Listed' double check valve or
some other no less effective backflow prevention device
is permanently connected at the inlet to the circuit and
the temporary connection is removed after use. The
filling method adopted must be in accordance with all
relevant water supply regulations and use approved
equipment.
Your attention is drawn to, for GB: Guidance G24.2 and
recommendation R24.2 of the Water Regulations Guide.
for IE: the current edition of I.S. 813 "Domestic Gas
Installations".
5. MAKE UP SYSTEM - A method of replacing water
lost from the system should be provided either by
means of a make up vessel of not more than 3 litres (5
pints) capacity, mounted above the highest point of the
system, or by re-pressurisation of the system.
6. VENTING - A method of venting the system during
filling and commissioning must be provided by fitting
automatic air vents or by venting manually.
7. HOT WATER STORAGE - The hot water storage
vessel must be of the indirect coil type. All components
used in the system must be suitable for operation at
110°C and at the pressure allowed by the safety valve.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents