Edgewater Networks EdgeMarc 250AE Hardware Installation Manual page 8

Enterprise session border controller
Table of Contents

Advertisement

EdgeMarc 250AE Hardware Installation Guide
Table 1-1 EdgeMarc 250AE Front Panel LEDs
#
LED Label
Activity
2
Ethernet
Solid Green
LAN (1-8)
Flickering
Green
Off
3
DSL
Solid Green
Off
Flashing
Green
Flashing
Green and
Solid Red
Flashing
Red
4
Internet
Solid Green
Off
Flashing
Green
Red
5
Activity
Off
Flickering
Green
6
VoIP
Off
Solid Green
Solid
Amber
4
Signal
A powered device is connected to the associated port.
LAN activity is occurring with the device that is connected
to the port.
Note: A flickering light is synchronized with actual data
traffic.
A device that is connected to the port is not powered on or
there is no network connection to the device.
DSL connection is synchronized with actual data traffic.
The device is not powered.
Attempting to synchronize the connection.
Attempting to synchronize the connection after three
consecutive minutes have passed.
No DSL connection and no signal.
The device has a WAN IP address and is connected.
The device is not powered or the broadband connection is
not present.
Attempting PPP connection.
Device attempted to become IP connected and failed.
The device is not powered or the broadband connection is
not present.
Internet activity detected via the broadband connection.
Note: The flickering of the light will be synchronized with
actual data traffic.
Not connected.
Data is being streamed to the connection using RTP
forwarding.
Note: In the case of LAN to LAN calls, the LED light is off
because RTP forwarding is not present.
The system is booting.
© 2014 Edgewater Networks. All Rights Reserved.

Advertisement

Table of Contents
loading

Table of Contents