Transportation Of The Unit; Installation Of The Unit - Fujitsu AOU48RLXFZ1 Installation Manual

Outdoor unit
Hide thumbs Also See for AOU48RLXFZ1:
Table of Contents

Advertisement

31 31 31
Outdoor units installation in multi row
(1) Single parallel unit arrangement
1000(39-3/8)
31 41

Transportation of the unit

Do not touch the fins. Otherwise, personal injury could result.
When carrying the unit, hold the handles on the right and left sides and be careful.
If the outdoor unit is carried from the bottom, hands or fingers may be pinched.
Be sure to hold the handles on the sides of the unit. Otherwise, holding the suction grille on the sides of the unit
may cause deformation.
Handle
31 51

Installation of the unit

Install 4 anchor bolts at the locations indicated with arrows in
the figure.
To reduce vibration, do not install the unit directly on the
ground. Install it on a secure base (such as concrete blocks).
The foundation shall support the legs of the unit and have a
width of 50mm(1-31/32in.) or more.
Depending on the installation conditions, the outdoor unit may
spread its vibration during operation, which may cause noise
and vibration. Therefore, attach damping materials (such as
damping pads) to the outdoor unit during installation.
Install the foundation, making sure that there is enough space
for installing the connection pipes.
Secure the unit to a solid block using foundation bolts. (Use
4 sets of commercially available M10(3/8in.) bolts, nuts, and
washers.)
The bolts should protrude 20mm(25/32in.). (Refer to the
figure.)
If overturning prevention is required, purchase the necessary
commercially available items.
En-10
150(5-29/32)
2000(78-3/4) or more
600(23-5/8)
(Unit: mm(in.))
(2) Multiple parallel unit arrangement
600(23-5/8)
1500(59-1/16)
WARNING
CAUTION
Suction grille
(Unit : mm(in.))
166(6-17/32)
500(19-11/16)
3000(118-1/8) or more
Handle
Handle
650(25-19/32)
AIR
50(1-31/32)
50(1-31/32)
Bolt
Nut
Base
154(6-1/16)