9.0 Fixing The Appliance - Ekofires eko 1010 Installation And User Instructions Manual

Electric wall heater
Table of Contents

Advertisement

9.0
FIXING THE APPLIANCE
A) Marking Positions:
Having selected the final mounting position for the appliance, taking into account the site
requirements as detailed in section 4, the heater can now be fixed to the wall.
There are three fixing positions, two upper "hanging" positions", and one lower position on the
backpanel located behind the fuel bed. Refer to Fig 4 for details.
A template is provided to aid location of fixings. Use a spirit level to ensure that the template is
level. This ensures that both upper and lower fixing positions are horizontally aligned.
Using the template in the required position on the wall, "mark through" the template and onto
the wall at the three mounting locations designated "P23E" for this particular appliance. Now
remove the template.
B) Wall Fixings:
If the appliance is to be mounted on the inner leaf of a conventional cavity wall or a solid wall,
drill three holes using a 7mm masonry bit.
Insert the wall-plugs provided. If the appliance is to be mounted on a dry lined wall or timber
framed construction, then special cavity screw fixings will be required, that are not supplied with
this product. Insert 2 x 37mm long fixing screws into the upper two wall-plugs, taking care to
leave the screws protruding approximately 6mm from the wall.
The appliance can now be "hung" onto the two upper wall fixings, ensuring that the heads of the
screws go through the keyhole shaped holes, and then drop down into the slot.
Ensure that the lower rear panel fixing hole aligns with the wall plug, and then insert 1 x 37mm
long fixing screw and fully tighten.
Finally fully tighten the two upper fixing screws, through the two panel acess holes at the front
of the appliance.
C) Re-Assembly of Appliance:
Note: re-assembly is the reverse of disassembly as described in section 8.0
1. Refit the fuel bed, ensuring that the lamp spinner is free to rotate.
2. Refit the lower lamp cover plate, firstly inserting the bottom edge behind the firebox lip.
Secure with the two screws previously removed.
3. Reattach the front decorative frame by hanging onto the two upper fixing bolts, and reinsert-
ing the two lower fixing bolts through the lower fixing brackets. Retighten the two lower fixing
bolts.
Finally, peel off any remaining protective plastic coatings on the front frame, curved backpanel
and the plastic fuel bed.
D) Placement of Pebbles:
Unpack the pebbles and arrange them over the fuel bed.
The final pebble arrangement can only be done later
when the lamp is switched on and light shines up
through the transparent cover. The ideal pebble layout is
shown in the photograph on the right.
4
©
2009 Focal Point Fires plc.

Advertisement

Table of Contents
loading

Table of Contents