Test Sequence - Toshiba Portégé 650CT User Manual

Hide thumbs Also See for Portégé 650CT:
Table of Contents

Advertisement

Test Sequence

The diagnostic test checks the computer's components and printer
in a predefined sequence as follows:
1 system test
2 memory test
3 display test
4 external diskette drive test
5 HDD (hard disk drive) test
6 printer test
While a test is in progress, the program displays:
IN PROGRESS TSSDSS
where T indicates the test number, the first SS indicates the subtest
number, D indicates the drive (if tested), and the second SS indi-
cates the hardware status. This message may remain on the screen
for a moment. The following sections describe each subtest.
System Functions and Memory
The system functions and the memory tests run together for
approximately two seconds. The system functions test doesn't
display any messages. The memory test displays the following
message:
PROGRESS xxxxxx
where xxxxxx is the current memory location being tested. The
memory test includes conventional and extended memory.
If either test aborts:
1 Write down everything that appears on the screen.
2 Press
Ctrl
3 Consult your dealer.
Part II: Technical Reference
The Diagnostic Test
+
to return to the diagnostics menu.
Pause
431
Test Sequence

Advertisement

Table of Contents
loading

Table of Contents