Propeller Shaft And Differential Carrier; Removing Bearing; Removing Locking Nut - Datsun 620 Series 1977 Service Manual

Datsun pick-up 620 series 1977 service manual
Table of Contents

Advertisement

PROPELLER SHAFT
DIFFERENTIAL
CARRIER
Watch for oil
leakage
from
trans
mission
end
Notes
a
Remove
propeller
shaft
carefully
so
as
not to
damage
spline
sleeve
yoke
and
rear
oil seal
b
Plug
up the
opening
in the
rear
of
rear
extension
housing
to
prevent
oil from
flowing
out
To
install
reverse
the
foregoing
removal
procedure
1
Align
propeller
shaft with
com
panion flange using
reference marks
prescribed
in
removal
procedure
and
assemble
with
bolts
Tightening torque
2
4 to
3
3
kg
m
17 to
24 ft Ib
2
Insert bolts
through
the holes of
center
beariug
bracket and
torque
nuts
to
retain
center
bearing
on
cross
member
Tightening
torque
1
6
to
2
2
kg
m
12
to
16 ft Ib
DISASSEMBLY
AND
ASSEMBLY
Primarily
do
not
disassemble pro
peller
shaft because
it is
balanced
as an
assembly
However
check
propeller
shaft
with
journal
for
movement
When
journal
does
not
move
smoothly
dis
assemble
1
Mark
propeller
shaft and
journal
so
that the
original
combination
can
be restored
at
assembly
2
Remove snap
ring
with
a
standard
screwdriver
3
Lightly tap
base of
yoke
with
a
hammer
and withdraw
bearing
race
See
Figure
PD
4
PDOO5
Fig
PD 4 Remo
i
bearing
Note
When
removing journal
from
yoke
be
careful
not
to
damage
journal
and
yoke
bole
When
disassembling
and
repairing
center
bearing
are
required
the follow
ing procedures
are
applied
1
Put match marks
on
flange
and
front
propeller
shaft
Remove bolts
connecting
flange
yoke
to
companion
flange
2
Applying
Drive
Pinion
Flange
Wrench ST3lS30000 loosen off lock
ing
nut and
remove
center
bearing
See
Figure
PD 5
P0172
ST31530000
Fig
PD 5
Remouing locking
nut
To
assemble
reverse
the
foregoing
procedure
using
reference marks pre
scribed
in
disassembly procedure
New
bearing
need
not
be lubricated
since it is
lubricated for life Fill
joint
with
recommended
multi purpose
grease
whenever
propeller
shaft
is
overhauled
Use related
snap
rings
of the
same
thickness and be
sure
that
play
is
below
0
02
mm
0
0008
in
Available snap
ring
Thickness
mm
in
Color
identification
2 00 00787
2 02 0079S
2
Q 4 0 0803
2 06 0 08 II
2 08 0 0819
2 1 0
0 0827
2 1 2
0 83S
2
14
00843
White
Yellow
Red
Green
Blue
Right
Brown
No
paint
Pink
PD
3
Install and assemble components
correctly
so
that
joint
moves
under
friction
resistance
of less than
is
o
kg
em
13
in lb
When
the
above
steps
are
complete
place
the
shaft
in
a
balancing
machine
and
adjust
unbalance
less
than 3S
gr cm
0
4 9
in
oz
at
S 8 00
rpm
Center
bearing
assembling
pro
cedures
are as
follows
I
Install
center
bearing
in center
bearing
insulator
2
Install
center
bearing
assembly
and
companion flange
on
front shaft
usiug
reference marks established
in
disassembly
procedure
3
Install washer
and
locking
nut
on
front shaft and
tighten
nut
using
Drive
Pinion
Flange
Wrench ST3IS30000
to
specified
torque
Tightening
torque
20 0 to
24 0
kg
m
I4S
to
174 ft lb
4
Join
companion
flange
of front
shaft with
f1ange
yoke
of
rear
shaft
and
tighten
connect
bolts
to
specified
torque
Tightening torque
2 4 to 3
3
kg
m
17
to
24 ft Ib
S
Install
center
bearing
bracket
on
center
bearing
INSPECTION
I
Check
journal pin
for dent
or
brinell marks
and
yoke
hole for
sign
of
wear or
damage
Snap ring
bearing
and seal
ring
should also be
inspected
to
see
if these
are
damaged
worn or
deformed
Re
place
if
necessary
2
heck
center
bearing
by
rotating
bearing
race
If
it is
rough
noisy
or
damaged
discard
Cracked
bearing
insulator
cannot
be tolerated here
3
Check
propeller
shaft tube
sur
face
for
dent
or
crack
Change
if
necessary

Advertisement

Table of Contents
loading

Table of Contents