Download Print this page

Belling 083138906 User Manual page 24

Dual fuel

Advertisement

InstAllAtIon - DUAl FUel
PRoDUcts WItH cAst IRon lID
(WHeRe FItteD)
A 55mm clearance is required from the
back of the hotplate to the rear wall, to
allow the lid to be opened fully. To ensure
this clearance is maintained, the infill
piece (supplied) should be fitted using the
instructions below.
Fitting the infill piece between the
rear of the hob and the wall
Fix the infill piece to the wall - using
suitable screws and wall fixings (not
supplied) - and ensure it is level with the
hotplate as shown.
Note: The 55mm clearance dimension
should not be reduced.
550mm
55mm

Advertisement

loading