CMO Operations & Logistics
Training & Vendor Development
Multimedia Creation & Support
7. Check the correct positioning of the keys before continuing. 8. Now insert the VOLUME KEY and on the opposite side the
9. Place the ENGINE BOARD into the D-COVER.
11. Set the correct torque and tighten in.
Service Manual 6131NFC RM-216
Page
23
(40)
CONFIDENTIAL
FUNCTION/POWER KEY. Take special care not to bend the spring
contacts.
10. Insert the board screw with tweezers.
12. Place the Push to Open Button into the HINGE CAP RIGHT.
Copyright © 2006-2007 NOKIA Corporation. All rights reserved.
Approved 4.0
MGR
12.Sept.2007