5-PLUMBING CONNECTION

PLUMBING CONNECTION
IMPORTANT!
If installation of the product involves interaction with another, pre-existing system complete with heating
equipment (gas boiler, methane boiler, diesel boiler, etc.), contact qualified personnel, who subsequently will be
responsible for conformity of the system in compliance with the applicable law in force.
The Company declines all responsibility for damage to persons or things in the event of failed or incorrect operation,
if the aforementioned warnings are not complied with.
It is important that ONLY qualified engineers are used to fit and commission the appliance in ALL cases. The installing
engineer MUST hold a QCF recognised biomass qualification. Any company using sub-contractors MUST ensure they also
hold the relevant qualifications (ONLY FOR UK).
1
OUTLET
2
SAFETY VALVE
3
FILLING
4
1/2"G MALE DOMESTIC WATER OUTLET
Make the connections to the corresponding fittings shown in the diagram above. Make sure the pipes are not placed under tension or
undersized.
IMPORTANT!!!
FLUSH THE ENTIRE SYSTEM BEFORE CONNECTING THE BOILER IN ORDER TO REMOVE RESIDUES AND DEPOSITS.
Always install gate valves upstream from the boiler so as to disconnect it from the plumbing system should it be
necessary to move it, or when it requires routine and/or special maintenance.
Connect the boiler using hoses so that the boiler is not too strictly connected to the system, and to allow slight
movements.
26
5
1/2"G MALE DOMESTIC WATER INLET
6
3/4"G MALE HEATING RETURN
7
3/4"G MALE HEATING DELIVERY