Console Units; Mounting Brackets- Unit Upgrades - BONAIRE WFBL26 Installation Instructions Manual

Wfbl series deluxe wall furnace
Table of Contents

Advertisement

D
W
F
ELUXE
ALL
URNACE
Wall Preparation
C
U
ONSOLE
NITS

Mounting Brackets- Unit Upgrades

IMPORTANT NOTE: If an existing wall furnace
is being replaced, use the new mounting
brackets provided with the unit.
Preparation of Timer Framed Walls - see
Fig.1
1. Establish datum line a minimum of 100mm
from the floor or 65mm above the skirt board if
the skirting board is greater than 65mm.
2. Position the bottom the base plate with the
datum line and fix into position over 2 studs or
centered on one stud.
3. Provide a gas connection at the lower right
hand side of opening – refer to section Gas &
Electrical this document.
4. Cut away ceiling cornice to suit flue screen
size.
5. Cut ceiling penetration hole to suit the twin skin
flue.
6. Header and base plate brackets are located
inside the unit. To get the brackets:-
6.1. Remove the cabinet top retaining screws –
see fig. 3
6.2. Lift the cabinet up and out of the bottom
plastic moulding.
6.3. Disconnect the thermostat loom
6.4. Disconnect the cabinet earth lead.
7. Fit the base plate to the wall surface, securing
to the wall studs level with the datum line and
central to the location of the heater. Check for
flue obstruction & clearances with roof or
ceiling timbers.
8. Bend top tags of the header plate down to
clear the inside of the front cabinet. Position
header plate and nail in level with datum line
and central to the location of the heater.
Page 7
Fig. 1
Fig. 2
Fig. 3

Advertisement

Table of Contents
loading

Related Products for BONAIRE WFBL26

This manual is also suitable for:

Wfbl30Wfbl40

Table of Contents