Wall Preparation; Inbuilt Units; Mounting Brackets - Unit Upgrades - BONAIRE WFBL26 Installation Instructions Manual

Wfbl series deluxe wall furnace
Table of Contents

Advertisement

D
W
F
ELUXE
ALL
URNACE

Wall Preparation

Wall Preparation
I
U
NBUILT
NITS
Mounting Brackets – Unit Upgrades
IMPORTANT NOTE: If an existing wall furnace is
being replaced, use the new mounting brackets
provided with the unit.
Preparation of Timer Framed / Brick Veneer
Walls. See Fig.1
1.
Minimum wall depth required including veneer is
90mm
2.
Establish datum line a minimum of 130mm from
the floor or 65mm above the skirt board if the
skirting board is greater than 65mm.
3.
Cut a frame opening 1980mm high from the
datum line and 410 – 430mm wide. Locate wall
studs and noggins.
electrical cables and flue obstructions.
4.
Provide a gas connection at the lower right hand
side of opening – refer section Gas & Electrical
this document.
5.
Cut away top wall plate and immediate noggins.
6.
Unit header and base mounting brackets are
located inside the unit. To get the brackets:-
6.1. Remove the 2 cabinet top retaining screws.
See Fig. 2
6.2. Lift the cabinet up and out of the bottom
plastic moulding.
6.3. Disconnect the thermostat loom.
6.4. Disconnect the cabinet earth wire.
7.
Bend ends of the base plate to fit stud opening -
see Fig. 3. Position plate and nail in level with
datum line and with folded bottom edge flush with
the veneer wall surface.
8.
Bend ends of the header plate to fit stud opening.
Position header plate, locating the giprock /
veneer in the header bracket locator and nail in
level with datum line. The folded edge must be
flush with the veneer wall surface.
Incorrect application of this bracket will
contravene AS5601 code.
Check for pipes and
Page 6
Fig. 1
Fig. 2
Fig. 3

Advertisement

Table of Contents
loading

Related Products for BONAIRE WFBL26

This manual is also suitable for:

Wfbl30Wfbl40

Table of Contents