Preparation Of Piping; Cut The Pipes And The Cable; Burrs Removal; Flaring Work - LG Multi V Plus II System Installation Manual

Outdoor unit with r410a air conditioner
Table of Contents

Advertisement

Preparation of Piping

Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the following procedure.

1) Cut the pipes and the cable.

I Use the accessory piping kit or the pipes purchased
locally.
I Measure the distance between the indoor and the out-
door unit.
I Cut the pipes a little longer than measured distance.
I Cut the cable 1.5m longer than the pipe length.

2) Burrs removal

I Completely remove all burrs from the cut cross section
of pipe/tube.
I Put the end of the copper tube/pipe to downward direc-
tion as you remove burrs in order to avoid to let burrs
drop in the tubing.

3) Flaring work

I Carry out flaring work using flaring tool as shown below.
Pipe
Indoor unit
[kW(Btu/h]
Gas
Liquid
<5.6(19,100)
1/2"
<16.0(54,600)
5/8"
<22.4(76,400)
3/4"
Firmly hold copper tube in a bar(or die) as indicated
dimension in the table above.
4) Check
I Compare the flared work with figure below.
I If flare is noted to be defective, cut off the flared section
and do flaring work again.
" A "
Gas
Liquid
1/4"
0.5~0.8
0~0.5
3/8"
0.8~1.0 0.5~0.8
3/8"
1.0~1.3 0.5~0.8
Copper
Slanted Uneven Rough
tube
90°
Pipe
Point down
Bar
Bar
"A"
Copper pipe
Clamp handle
Smooth all round
Inside is shining without scratches.
= Improper flaring =
Inclined
Surface
damaged
Even length
all round
Installation Manual 21
Installation
Reamer
Handle
Yoke
Cone
Red arrow mark
Cracked Uneven
thickness

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents