Scheduled Events - Telecor VS1 Installation, Configuration & Operating Manual

Pc-based expandable
Table of Contents

Advertisement

SCHEDULED EVENTS

A Scheduled Event runs a Command Script at a specific user-defined time during a day of the week.
Up to 114 Scheduled Events can be created to run anytime during a weekly schedule (Sunday
through Saturday). Scheduled Events run on a weekly repeating basis—not for specific days such as
July 4, 2003. For example, every Tuesday at 3:00 p.m. you could run a Command Script that plays a
message over the paging system.
The most common examples of Scheduled Event:
Loading the Day or Night configurations.
Playing prerecorded announcements over the paging system.
Copying SMDR data to system files.
Performing scheduled hard drive maintenance.
Scheduled Events
pane
To create a Scheduled Event, complete the following steps:
1. Select Scheduled Events in the Tree Control Display.
The Scheduled Event pane appears. In the list box, there is a number of default Scheduled
Events, including the Command Scripts that backup SMDR data to system files. Do not
delete these Scheduled Events as they keep the original summary.dlm and acd.dlm output
files (the files where SMDR data is collected) down in size.
2. In the list box select a Scheduled Event number line that is empty.
3. In the Scheduled Events Entry group box, enter the following information:
Check the days of the week that the Scheduled Event will run.
In the Time text box, type the time of day in 24-hour format that you want the Command
Script to run.
In the File drop-down box, select the Command Script that will run.
4. Click the Save button in the toolbar.
154
VS1 Editor Configuration Application

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Telecor VS1

Table of Contents