Burnham Revolution Installation, Operating And Service Instructions page 50

Gas- fired boiler
Hide thumbs Also See for Revolution:
Table of Contents

Advertisement

4. All above ground gas piping upstream from manual
shut-off valve must be electrically continuous and
bonded to a grounding electrode. Do not use gas
piping as grounding electrode. Refer to National
Electrical Code, NFPA 70.
C.
Pressure test. The boiler and its gas connection must be
leak tested before placing boiler in operation.
1. Protect boiler gas control valve. For all testing over
½ psig, boiler and its individual shutoff valve must
be disconnected from gas supply piping. For testing
at ½ psig or less, isolate boiler from gas supply
50
piping by closing boiler's individual manual shutoff
valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonflammable
solution.
DANGER
Do not use matches, candles, open flames or
other ignition source to check for leaks.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents