Horizontal Vent Terminal; Vertical Vent Terminal; Vertical Air Intake Terminal - Burnham Revolution Installation, Operating And Service Instructions

Gas- fired boiler
Hide thumbs Also See for Revolution:
Table of Contents

Advertisement

Figure 1
Figure 18: Indoor Air - Horizontal / Vertical Vent Terminal Installation
Extend Vent/Air Intake Piping to maintain minimum vertical ("X") and minimum horizontal ("Y") distance of twelve
(1) inches from roof surface. Allow additional vertical ("X") distance for expected snow accumulation.
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents