Troubleshooting And Tips; Power-On Indicator Remains Unlit; Server Node Switches Itself Off - Fujitsu PRIMERGY CX2550 M1 Operating Manual

Server node
Hide thumbs Also See for PRIMERGY CX2550 M1:
Table of Contents

Advertisement

8

Troubleshooting and tips

V
CAUTION!
Follow the safety instructions in the "Safety notes and regulations"
manual or " 安全上のご注意 " and in chapter
page
21.
If a fault occurs, attempt to resolve it using the measures described:
– in this chapter,
– in the documentation for the connected devices,
– in the help systems of the software used.
8.1

Power-on indicator remains unlit

The power-on indicator remains dark after you switch on your device.
Power cable incorrectly connected
Ê Make sure that the power cable(s) is/are correctly connected to the server
node and the grounded power outlet(s).
Power supply overloaded
Ê Disconnect the server node power plug(s) from the grounded power
outlet(s).
Ê Wait a few minutes before you plug it/them into the grounded power outlet(s)
again.
Ê Switch on your server node.
8.2

Server node switches itself off

Server Management has detected an error
Ê Check the error list of System Event Log in ServerView Operations Manager
or in the iRMC S4 web interface, and attempt to eliminate the error.
CX2550 M1
Operating Manual
"Important information" on
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2570 m1

Table of Contents