Outdoor Unit Preparation - Toshiba RAS-10G2KVP Series Installation Manual

Hfc r410a air conditioners (split type)
Hide thumbs Also See for RAS-10G2KVP Series:
Table of Contents

Advertisement

Outdoor unit preparation

1. Loosen the screws for Valve cover then pull the Valve cover downward
and remove it.
2. Loosen the screws for Upper cabinet then lift the Upper cabinet upward
to remove it then take off water proof cover.
3. Loosen the screws for Front cabinet
4. Pull the right side of Front cabinet
5. Left side of front cabinet is inserted into Left side cabinet, remove by lift
up the front cabinet.
6. Slide the DRI cover to open for wire connection.
7. Connect DRED wires to the terminal of DRM.
8. Reassembly by reverse process.
Valve cover
3
1115751104-EN.indd 12
1115751104-EN.indd 12
2
Upper cabinet
Water proof cover
1
Demand response interface (DRI)
5
Demand response interface (DRI)
DRI cover
6
12
4
5/26/2557 BE 10:45 AM
5/26/2557 BE 10:45 AM

Advertisement

Table of Contents
loading

Table of Contents