Output Receptacle Distribution Options; Figure 7 Hardwire Terminal Connections - Orion Power Systems SCR2 User Manual

10kva online ups
Table of Contents

Advertisement

Figure 7
Hardwire terminal connections
7.2

Output Receptacle Distribution Options

WARNING
!
A qualified electrician should install the optional output distribution.
1. Verify that the input feeder circuit breaker is off.
2. Verify that the input and output circuit breakers are off.
3. Verify the UPS is completely OFF.
4. Remove the four screws holding the blank access plate from the rear of the UPS.
5. Connect the four-position Anderson connector of the PAD distribution into the mating connector
inside the UPS.
6. Using the same four screws, attach the PAD distribution option to the rear of the UPS.
7. Verify all distribution circuit breakers are in the ON position.
8. Follow the initial startup procedures listed in 7.0 - Initial Startup and Electrical Checks.
L1
N
L2
L2
OUTPUT
19
Initial Startup and Electrical Checks
N
L1
INPUT

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents