Download Print this page

Transit And Delivery - Sharp MX-M264U Installation Manual

Digital multifunctional system
Hide thumbs Also See for MX-M264U:

Advertisement

G. Note for proper drum, developing and fusing
unit handling
When handling the OPC drum and developing units, observe the
following items.
Drum unit
• To prevent damage to the OPC drum, avoid working on the drum
unit in high intensity light areas.
• When the OPC drum is removed from the machine, cover it with
light blocking material. (When using paper, use about 10 sheets
of paper to cover it.)
• Be careful not to attach fingerprints, oil, grease, or other foreign
material on the OPC drum surface.
Developing unit
• Be careful not to "leave" fingerprints, oil, grease, or other foreign
material on the developing unit.
Fusing unit
• Be careful not to "leave" fingerprints, oil, grease, or other foreign
material on the fusing roller.
If these items are neglected, a trouble may be generated in the
copy and print image quality.

2. Transit and delivery

No.
Content
1
Implements, facility,
and man power
2
Delivery
A. Implements, facility, and manpower
It is recommendable to use a forklift for bringing in the machine for
safety.
If no forklift is available, man-power of two persons is required. The
machine is considerably heavy, and requires safety precautions for
delivery and installation.
Transit of the machine must be made in packed condition to the
installing place.
Use care not to exert vibrations or shocks to the machine when in
transit.
B. Delivery
Remove the packing materials prior to installation in the office envi-
ronment.
Method
Use a forklift. (If no forklift is available,
manpower of two persons is required.)
Transit must be made in packed condition.
MX-M264U Transit, Installation (using) environment, Note - iii

Advertisement

loading

This manual is also suitable for:

Mx-m264nMx-m264nvMx-m264nrMx-m314uMx-m314nMx-m314nv ... Show all