INSTALLATION OF M200 & M250 MASTER STATIONS
Install the Master wall box flush with the front of the stud and brace it so as to limit any movement
of the box when fitting the Master Station.
After the wall has been lined, cut out an opening to the inside dimensions of the wall box.
Note: For M200 model, use Metal Wall Bracket Part Number: 100975
Wall Box for Master Station – Timber Frame Wall – Not Lined
Cut out an opening in the wall lining but do not cut right up against the wall stud or noggin ensuring
that there is enough wall lining overlap to cover the wall box frame.
Slide the Master wall box in side ways, then straighten it up and firmly nail it to the stud so that it is
flush with the front of the stud. (M250 H 325mm x W 270mm) (M200 H 190 x W 284)
Note: For M200 model, use Metal Wall Bracket Part Number: 100975
Wall Box for Master Station – Timber Frame Wall – Already Lined
12
12