3 . 2 . D a g g e r b o a r d R a k e T r i m
Tie the harken lead rings rope to the shrouds pin and lead the swiftcord DBD rake trim line
through these lead rings under the trampoline through the trampoline eye-rings around
the worm-drive wheel and back.
Lead the DBD rake trim line through the harken 29mm T2 single and splice both end into
each other as illustrated in the pictures. After splicing sew the splice.
Tie the beam shockcord to the T2 single 29mm bock.
Lead the shockcord through the beam to the otherside, tie the 16mm harken block with the
polyester rope to the beam casting to reverse the shockcord back the other entry side and
tie on the shockcord to the beam casting.