This reminder is provided to call the CCTV system installer's attention to Art. 820-40 of the NEC that provides
guidelines for proper grounding and, in particular, specifies that the cable ground shall be connected to the
grounding system of the building, as close to the point of cable entry as practical.
CE Mark
If this product is marked with the CE symbol it indicates compliance with all applicable directives.
Directive 89/336/EEC.
A 'Declaration of Conformity' is held at Dedicated Micros Ltd.,
11 Oak Street, Swinton, Manchester M27 4FL.
Choosing a location for installation
The Pick-a-Point workstation is designed to be desk or rack mounted. The following precautions must be taken
during installation:
•
Openings in the unit's case are provided for ventilation. To prevent overheating, these openings should
not be blocked or covered.
•
Ensure there is a 1" (2.54 cm) gap on either side of the unit.
•
When stacking units, ensure there is at least a ½" (1.3 cm) gap between each unit.
•
Ensure the unit is not located in an area where it is likely to be subjected to mechanical shocks.
•
The unit should be located in an area with low humidity and a minimum of dust. Avoid places like damp
basements or dusty hallways.
•
If the unit is to be installed in a closed assembly, the maximum operating temperature must not exceed
82°F (28°C).
•
Ensure there is reliable earthing of the mains outlet when fitted to supply connections, other than direct
connections, to the branch circuit.
•
Any branch circuit supplying the unit must be rated 15Amps.
•
It is recommended that an uninteruptable power source be connected to the unit in case of power failure,
to ensure continuous operation of the unit.
7
Need help?
Do you have a question about the Pick-a-Point and is the answer not in the manual?