IMPORTANT
When the revision number is changed after the drive is shipped
from the factory, Fujitsu issues "Engineering Change
Request/Notice" in which the new revision number is indicated.
When the user changes the revision number, the user should update
the revision label as described in item (2) after applying the
modification.
At shipment
Rev. A2
Revising at field
Rev. A3
Figure 6.2
Indicating revision numbers
6 - 8
C141-E078-02EN