Page 1
To obtain the Illustrated Parts Catalog, visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the catalog. Contact Bunn-O-Matic Corproation at 1-800-286-6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U.S. Postal Service.
Page 2
SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profi ts, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
USER NOTICES The notices on this dispenser should be kept in good condition. Replace unreadable or damaged labels. WARNING Very Hot Water Use With Care! 120V 120/208-240V 00656.0000 34056.0000 00824.0000 39338 100606...
ELECTRICAL REQUIREMENTS WARNING - The dispenser must be disconnected from the power source until specifi ed in Initial Set-Up. Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. 120V. A.C. 208 or 240V. A.C. 120V.
It can be purchased direct from Bunn-O-Matic (part number 00326-0000). Bunn-O-Matic does not recommend the use of a saddle valve to install the dispenser. The size and shape of the hole made in the supply line by this type of device may restrict water fl...
CLEANING The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. WALL MOUNTED INSTALLATION If the dispenser is wall mounted, the bottom of the dispenser should be at the same height as a counter or table top.
OPERATING CONTROLS P3743 (a) VOLUME SELECTOR BUTTONS Press and release the button corresponding to the Small, Medium, or Large volume, to select the desired amount of water to be dispensed. Pressing a different button after a cycle has been initiated does not change the volume in progress.
PROGRAMMING When power is applied to the dispenser, the display located on the bottom of the main circuit board will show the revision level of the software for 5 seconds, and then go to (-). While the tank is fi lling, the display will read (FIL).
Page 9
NOTE: The dispenser should be at operating temperature before setting dispense volumes. 1. Press and hold the hidden programming button, located under the ® next to the BUNN logo on the front of the dispenser until the 3 LED's begin fl ashing from the left to the right. Release the button.