Installation; Unpacking - Global-Tek GT-CR1/BU Instruction & Installation Manual

Gle-tank conveyor type
Table of Contents

Advertisement

Global-Tek (Singapore) Pte Ltd
Auto Fill
Close door and push the POWER switch to ON. The machine fills automatically
from two different areas, final rinse & fill valve. Water is heated in booster, and then
flows into wash tank. After the tank is filled with required level, fill will stop
automatically.
Auto Timer
The Auto Timer switch is located on the left hand side of the control box. Designed
to save electrical power, it is adjusted to shut off pump and drive motors and optional
exhaust vent fan control after the last rack exits the dishwasher. To restart, slide a
rack into the machine or push MOTOR switch to ON. To change the time setting,
contact your local authorized service office.
Front Panel
Stainless steel front panel conceals motors, pumps and plumbing.
Common Water Connection
A single water connection for Fill and Final Rinse is standard. Maximum feed
temperature to the machine is 65C with 15 - 20 psi incoming water pressure. Excess
water pressure or temperature will cause damage to booster heater tank.

INSTALLATION

UNPACKING

Immediately after unpacking the dishwasher, check it for possible shipping damage.
If this machine is found to be damaged after unpacking, save the packaging material
and contact the carrier within 3 days from date of delivery.
Prior to installation, verify that the electrical service agrees with the specifications
on the machine data plate, which refer to the operation and services manual
Page 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents