Physical Installation; Introduction - Solectek SkyWay-Excel Series User Manual

Solectek skyway-excel series point-to-point (ptp) wireless kit
Table of Contents

Advertisement

NOTE
performance of the PC hardware, operating system and IP stack. To ensure that
this test equipment is not a performance bottleneck, pre-testing PCs, by connecting
them directly to each other, is strongly recommended.
NOTE
Windows/Intel machine is not adequate to accurately measure throughput.
NOTE
expected to deliver full rated throughput.
performed after a system is deployed.
WARNING
must be sealed to prevent water intrusion. The port is factory configured with a
sealing pin. Please leave it in place until you are ready to connect to a GPS
controller.

5. Physical Installation

5.1 Introduction

Your SkyWay radio is designed with a mounting system with two degrees of freedom. The radio
can be mast, tower, pole or wall mounted using the appropriate hardware. After determining the
best location for your radio, installation can begin.
To mount a SkyWay-Excel radio unit, both the mast mounting kit and Ethernet cable
feedthrough need to be correctly assembled. The recommended approach consists of 3 or 4
steps, detailed in the following sections:
Ethernet cable / feedthrough assembly
Bracket preparation
Mounting
Antenna mounting (for connectorized units, only)
- Keep in mind that the SkyWay-Excel data rates will stress the
-Using a file transfer to a shared volume or an FTP session on a typical
- Units bench tested in an indoor configuration should not be
When it is not in use, the GPS port of the GPS-ready Master unit
Benchmarking is typically
16

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SkyWay-Excel Series and is the answer not in the manual?

Questions and answers

Table of Contents