Doosan G430 LP Service Manual page 136

G430 lp engine
Table of Contents

Advertisement

VE041-3L
6. Install the gauging plastic (1) onto the connecting
rod bearing journal. Install the gauging plastic the
full width of the journal.
VE037-3L
7. Install the connecting rod cap and bearing.
Tighten
Tighten the nuts evenly to 61 N•m (45 lb•ft).
LP Engine G430 (3.0L)
VE037-3L
8. Remove the connecting rod nuts.
9. Remove the connecting rod cap and bearing.
VE042-3L
10. Measure the gauging plastic at its widest area
using the scale supplied with the plastic gauging
kit.
11. Compare the measurements to Engine Mechanical
Specifications.
- 135 -
Base Engine Service Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

G30p-3G20p-3G25p-3Gc20p-3Gc25p-3Gc30p-3 ... Show all

Table of Contents