Plumbing Manifold - Worcester Gas boiler Installation Instructions Manual

Wall hung rsf gas fired condensing boiler greenstar i system optional integral diverter valve for central heating systems and indirect fed domestic hot water
Table of Contents

Advertisement

PLUMBING MANIFOLD

2
PLUMBING MANIFOLD
CONNECTIONS:
• Heating System: 22mm compression fittings
• Gas: 22mm compression fitting
• Cylinder Return 15mm compression fitting
• Use the fittings supplied in the Hardware literature
pack and the Optional Diverter Valve Kit.
NOTICE: Fitting the service valve
B Refer to figure 2
B The service valve (7) from the Optional
Diverter Valve Kit must be fitted and
secured to the wall mounting frame with
two screws (8) supplied, before the wall
mounting frame is fitted to the wall.
If the boiler pipes are to be run behind the appliance
ensure that the pipes pass through the slot in the
guide (9). This is fitted to the boiler frame.
Further guidance on pipe routing can be
found printed on the boiler template
(supplied with the boiler).
4
1
Fig. 1
Pipe dimensions
6
2
6
3
5
1
2
9
4
1
Fig. 2
Plumbing manifold with wall frame
#
Function
1
CH and cylinder flow
2
Gas
3
CH Return
4
Condensate
5
Pressure Relief Valve
6
Cylinder return
Tab. 4
Key to figures 1 & 2
6 720 645 222a (2012/05)
6
3
8
5
7
6720644222-01.1Wo
2
3
6
From left
Diameter
case edge
of pipe
70 mm
22 mm
200 mm
22 mm
330 mm
22 mm
35 mm
22 mm
367 mm
15 mm
267 mm
15mm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsf

Table of Contents