Mitsubishi Electric Mr.Slim PUHZ-ZRP35VKA Service Manual page 143

Split-type, heat pump air conditioners r410a
Hide thumbs Also See for Mr.Slim PUHZ-ZRP35VKA:
Table of Contents

Advertisement

OPERATING PROCEDURE
12. Removing the reactors (ACL1, ACL2, ACL3)
(1) Remove the service panel. (See Photo 1)
(2) Remove the 4 fixing screws the reactor box. (2/front,
2/back of reactor).
(3) Disconnect the lead wires from the reactor. (See Photo 17)
(4) Remove each 4 fixing screws (2/front, 2/back of reactor) of
3 reactors.
Note 1: The reactor is very heavy (4 kg) !
Be careful when handling it.
Note 2: The reactor box is also removable.
Photo 17
Reactors
OCH527
Photo 16
Lead wires of reactors
Figure 2
Reactor box fixing screw (front)
Reactor box fixing screw (front)
143
PHOTOS
Reactors
Reactors
Reactor fixing screws (front)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents