Canon PC400 Service Manual page 129

Hide thumbs Also See for PC400:
Table of Contents

Advertisement

I. SELECTING THE SITE
Make the following considerations when selecting the site for the machine.
It is a good idea to visit the site before delivery of the machine.
The site should provide an exclusive power outlet with a grounding terminal.
The temperature and humidity of the site must be 7.5° to 32.5°C/45.5° to 90.5°F and
5% to 85%, respectively.
humidifiers, or refrigerators.
Avoid areas near open fires and areas subjected to dust, ammonium gas, or
sunlight. If necessary, provide curtains.
The site must be well ventilated.
The floor must be level, ensuring all copier's feet will remain in contact.
The copier must be at least 3.9 in. from all walls, enabling sufficient space for
maintenance and copying work.
COPYRIGHT © 1998 CANON INC.
Avoid areas near water faucets, water boilers,
10cm/
3.9in. min
Figure 8-101
CANON PC400/420/430,FC200/220 REV.0 JAN.1998 PRINTED IN JAPAN (IMPRIME AU JAPON)
CHAPTER 8 INSTALLATION
10cm/3.9in. min
8-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc420Pc430Fc200Fc220

Table of Contents