DHW Cylinder
S Plan with pump overrun, evotouch controller and two BDR91 relays
Sundial S plan wiring plan
NOTE:
1. It is recommended that
either the 10 way junction
box or Sundial Wiring Centre
should be used to ensure
first time, fault free wiring.
2. If using the V4043H1080
(1" BSP) or V4043H1106
(28mm), the white wire must
be electrically isolated.
Pump overrun
7
8
9
N
E
L
PUMP
Whilst Honeywell takes all reasonably practicable steps to design and manufacture its products to comply with the requirements of the Health and Safety at Work Act 1974, all products must be properly used and
purchasers are reminded that their obligations under the Act are to ensure that the installation and operation of such products at a place of work should be safe and without risk to them.
These wiring diagrams are for guidance only and at the time of printing represent the latest information available to us from other manufacturers. Honeywell reserve the right at any time and without notice to change