Sequence of Operation

Starting Circuit: Upon a call for heat, the fan and transformer is energized by 120VAC from the
thermostat/controller. Once operational static pressure is achieved, the differential pressure switch
closes, sending power to the ignition module. After a seven-second pre-purge, the spark igniters
and the solenoid of the gas valve are simultaneously energized. The trial for ignition is 15 seconds.
Running Circuit: After ignition, the control monitors burner flame through the flame sensors. If sense of
flame is lost, the control immediately sparks (identical to the starting sequence). If flame sense is not
established within 15 seconds, the heater will attempt two (2) additional ignition sequences before
proceeding to lockout mode. The control can be reset by briefly interrupting the power source.