Miele KF 1801 Vi Operating And Installation Instructions page 65

Miele fridge freezer operating and installation instructions
Table of Contents

Advertisement

Before using the appliance for the first
time the water inlet pipe should be
purged of air by a qualified and
competent person.
– To do so the stainless steel hose
should be filled as far as possible
with water before being connected to
the appliance.
– Mop up any spillages with a cloth.
^ Lay the stainless steel hose in the
building-in niche as shown, and
secure to the floor with adhesive
tape.
This ensures that the hose cannot
slip or get caught when the
appliance is pushed back into the
niche.
^ The appliance can now be installed
in the niche (see "Installation").
Mains water connection
Appliances with an opening for feeding
the hose through:
^ Position the appliance in front of the
building-in niche and feed the
stainless steel hose through the
opening at the back of the appliance.
At this stage the building-in niche
should be ready for the appliance to
be pushed into the niche (see
"Installation").
^ Proceed with building in the
appliance.
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kf 1811 viKf 1901 vi

Table of Contents